There are times when the engineering department will construct a Bill of Material for a functional part of a design, but in production the Bill of Material is never produced as a sub-assembly, but rather is built as part of the final assembly process. A Bill of Material used in this manner is called a Phantom Bill of Material.
Posted inDynamics NAV & BC Tips & tricks